ENGINEERING AND CONSULTING

work phases

- Site Survey

Search Building Characteristics

- Creating Floor Plan with FA Information

Job Filing with DOB

Job Filing with FD

Resolve Objections From FD If Any

- Obtaining The Permit And Approved Drawings

- Creating The Final FA As-Built Drawing

- Scheduling FD Inspection

- Obtaining The Final Sign Off

 

 

 

This website is created and hosted by Website.com's Site Builder.